The laying of the temple was consecrated on July 24, 2004. Construction is funded by private donations, as well as assistance with building materials, labor, and services. The Assumption Church was originally designed as a warm structure and consists of four parts: the altar area in a semicircular apse, the main volume, expanded beyond the square by a deacon's room and an altar, a tent at the entrance, and a multipurpose room in the bell tower.
Comments
No comments yet. Be the first.
To leave a comment, sign in with Google.